St. Chrysostom's C of E Primary School

St John's Logo

Client: St. Chrysostom’s C of E Primary School

Location: Chorlton on Medlock, Greater Manchester

Contract Value: £183k

Contract Duration: 16 Weeks

Project: Staff Room Extension

  • Specialist asbestos removal
  • Removal of the existing soft-play surface and paladin fencing/gate to facilitate formation of the new extension
  • The installation of a TREMCO Flat Roofing System – carries a 20-year guarantee
  • TRESPA Fascia System – Meteon multi-coloured fascia system to match the existing building’s
  • Drainage
  • Suspended ceilings
  • Mechanical and electrical works
  • Flooring – Polysafe Astral PUR safety flooring and carpet tiles
  • Aluminium windows and doors – powder coated to match the existing building’s doors and windows
  • Light oak hardwood veneer fire doors
  • Painting and decorating
  • New tarmac covering to the boundary of the new extension
  • New soft-play surface to the side of the new extension
  • Re-instatements works

Gallery

Accessibility