Client: St. Chrysostom’s C of E Primary School
Location: Chorlton on Medlock, Greater Manchester
Contract Value: £183k
Contract Duration: 16 Weeks
Project: Staff Room Extension
- Specialist asbestos removal
- Removal of the existing soft-play surface and paladin fencing/gate to facilitate formation of the new extension
- The installation of a TREMCO Flat Roofing System – carries a 20-year guarantee
- TRESPA Fascia System – Meteon multi-coloured fascia system to match the existing building’s
- Drainage
- Suspended ceilings
- Mechanical and electrical works
- Flooring – Polysafe Astral PUR safety flooring and carpet tiles
- Aluminium windows and doors – powder coated to match the existing building’s doors and windows
- Light oak hardwood veneer fire doors
- Painting and decorating
- New tarmac covering to the boundary of the new extension
- New soft-play surface to the side of the new extension
- Re-instatements works